Usulan Perbaikan Kualitas Produk POY menggunakan Pendekatan Quality Control Circle dan Delphi di Departemen CP-3 PT. Indo-Rama
DOI:
https://doi.org/10.31004/jutin.v8i3.48466Keywords:
QCC, Delphi, Quality Improvement, Partially Oriented YarnAbstract
PT. Indo-Rama Synthetics Tbk is a textile manufacturing company that produces Partially Oriented Yarn (POY) in the CP-3 Department. During the January-March 2025 period, defective products amounted to 1,396 bobbins, or an average of 0.16% of the total monthly production. Although small in percentage, these defects impact increased rework activities, decreased efficiency, and potential delivery delays. This study aims to identify the root causes of the defects and develop improvement proposals using the Quality Control Circle method, as well as evaluate them through the Delphi approach. The analysis revealed two main defects: No Tail Yarn (35%) and Unstandardized Bobbins (35%). The causes include factors related to methods, machinery, and human factors. The proposed improvements include using permanent markers, routine inspections, tracking service life, protecting guides with visual safety markings, and re-socializing procedures and disciplinary action. The implementation of these improvements is estimated to reduce defects by up to 65%.References
Amarta, Y. Y., & Hazimah. (2020). Pengendalian Kualitas Dengan Menggunakan Statistical Processing Control (Spc) Pada Pt Surya Teknologi. 3.
Dharsono, W. W. (2017). Penerapan Quality Control Circle Pada Proses Produksi Wafer Guna Mengurangi Cacat Produksi (Studi Kasus Di Pt Xyz Jakarta). In Jurnal Teknologi Dan Rekayasa (Vol. 2, Issue 1).
Levia, D., & Mhubaligh. (2023). Analisis Proses Produksi Cpo Untuk Mengidentifikasi Faktor-Faktor Yang Mempengaruhi Kualitas Mutu Cpo. Jurnal Teknologi Dan Manajemen Industri Terapan (Jtmit), 2(2), 82–89.
Mclean, R. S., Antony, J., Garza-Reyes, J. A., & Samadhiya, A. (2023). A Continuous Improvement Implementation Framework For Manufacturing Companies: A Delphi Study-Based Approach For Development And Validation. International Journal Of Quality And Reliability Management, 40(9), 2222–2246. Https://Doi.Org/10.1108/Ijqrm-04-2021-0096
Nashida, A. Annai, & Syahrullah, Y. (2021). Perbaikan Kualitas Pada Proses Produksi Kabel Type Nya Dengan Metode Quality Control Circle (Qcc) Pada Perusahaan Manufaktur Kabel Di Banyumas. Jurnal Ilmiah Mahasiswa Teknik Industri Universitas Kadiri, 3(2), 147–160. Https://Doi.Org/10.30737/Jurmatis.V3i2.1792.G1660
Parker, G., Kastner, M., Born, K., & Berta, W. (2021). Development Of An Implementation Process Model: A Delphi Study. Bmc Health Services Research, 21(1). Https://Doi.Org/10.1186/S12913-021-06501-5
Riadi, S. (2020). Pengendalian Jumlah Cacat Produk Pada Proses Cutting Dengan Metode Quality Control Circle (Qcc) Pada Pt.Toyota Boshoku Indonesia (Tbina). Journal Industrial Manufacturing, 5(1), 57–70.
Santi, Joice Tauris. (2016). Perubahan Tiada Henti 25 Tahun Perjalanan Qcc Toyota Indonesia ( Joice Tauris Santi, Ed.; 1st Ed.). Kompas Media Nusantara.
Yunus Nasution, A., Yulianto, S., & Ikhsan, N. (2018). Implementasi Metode Quality Control Circle Untuk Peningkatan Kapasitas Produksi Propeller Shaft Di Pt Xyz. 12(1). Http://Jurnal.Umj.Ac.Id/Index.Php/Sintek
Zuhroh, D. (2021). Perlakuan Akuntansi Produk Cacat Dan Produk Rusak Pada Pt “Epi” Di Surabaya (Vol. 24, Issue 1).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Nina Rahmayanti, Hendi Iskandar, Afif Fawa Idul Fata

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

