Mitigasi Risiko Kecelakaan Kerja pada Gudang Pusat Distribusi Menggunakan Metode HIRADC dan FTA untuk Penyusunan HSE Plan di PT. XYZ
DOI:
https://doi.org/10.31004/jutin.v8i3.48325Keywords:
HIRADC, FTA, Occupational Health and Safety, HSE Plan, Risk MitigationAbstract
The high number of workers at PT. XYZ's central distribution warehouse, without a systematically structured HSE system based on risk analysis, increases the vulnerability to workplace accidents. This aligns with national data from BPJS TK, which recorded 162,327 work accident cases from January to May 2024. This study aims to identify potential hazards, analyze risk levels using the HIRADC method, trace the root causes through Fault Tree Analysis (FTA), and design an HSE Plan tailored to actual warehouse conditions. The initial assessment showed 50% of risks were classified as high. After implementing risk controls based on the hierarchy of controls, high-risk levels dropped to 8.3%, while low-risk levels increased to 79.2%, indicating successful risk minimization. These findings emphasize the importance of a systematic HSE Plan to reduce workplace risks effectively.References
AS/NZS 4360. (2004). Risk Management Guidelines Companion to AS/NZS 4360:2004. Standards Australia/Standards New Zealand, 10(5), 31–31.
Mada, A. K., & Marodiyah, I. (2024.). Analysis of Work Accident Risk Control in Warehouse Transit Using HIRARC and FTA Methods [ Analisis Pengendalian Risiko Kecelakaan Kerja pada Warehouse Transit Menggunakan Metode HIRARC dan FTA ]. 1–12.
Perdana, F. M., Widjajati, E. P., & Tranggono, T. (2021). Analisis Risiko Keselamatan dan Kesehatan Kerja pada Departemen Produksi dengan Metode Hazard Identification, Risk Assessment and Risk Control (HIRARC) di PT. Romi Violeta Sidoarjo. Juminten, 2(6), 144–155. https://doi.org/10.33005/juminten.v2i6.335
Purbiantoro, A., & Bhaskara, A. (2019). Fault Tree Analysis And Accuracy Audits On Application Integrated Construction Work Safety Management System Case Study: Service Building Construction Project (Physical) Tidar Regional Hospital Magelang City, B1 Contractor. Publication.Petra.Ac.Id, 1–3.
Sadewa., Saifullah, H. (2025). Implementation of Hazard Identification , Risk Assessment , and Determining Control ( Hiradc ) System for Hazard Risk Management in Mining Work Environment at PT XYZ. 4(2), 2–6.
Sugiyono, P. D. (2017). Metode penelitian bisnis: pendekatan kuantitatif, kualitatif, kombinasi, dan R&D. Penerbit CV. Alfabeta: Bandung, 225(87), 48–61.
Suherdin, Widajati, N., Kurniawati, R. D., & Tualeka, A. R. (2020). Risk assessment, risk management, and risk communication at drug industries PT. Kimia Farma (Persero) tbk. Plant bandung. Indian Journal of Forensic Medicine and Toxicology, 14(1), 423–428. https://doi.org/10.37506/v14/i1/2020/ijfmt/192935
Sulistyo, B., Widyaputra, G., & Arjuni, D. (2023). Analisis Implementasi Sistem Tanggap Darurat (Emergency Response Plan) Berdasarkan Nfpa 1600 Tahun 2019 Di Ptog, Jawa Barat Tahun 2023. Jurnal Mutiara Kesehatan Masyarakat, 8(2), 81–91. https://doi.org/10.51544/jmkm.v8i2.4637
Vesely. (1981). Fault Tree Handbook (NUREG-0492). U.S. Nuclear Regulatory Comission, 209. https://www.nrc.gov/docs/ML1007/ML100780465.pdf
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Farhan Alyudin Sasmita, Haris Sandi Yudha, Agung Widarman

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

