Analisis Efektivitas Line Proses Fly Wheel, Presure Plate 2/1 dan Presure Plate 1/1 dengan Metode Overall Resource Effectiveness (ORE) di PT. Braja Mukti Cakra

Authors

  • Muhammad Aqshal Madani Universitas Muhammadiyah Jakarta
  • Wiwik Sudarwati Universitas Muhammadiyah Jakarta

DOI:

https://doi.org/10.31004/jutin.v8i3.47731

Keywords:

efektivitas, Overall Resource Effectiveness (ORE), 5W+1H, Line Process, Fishbone Diagram

Abstract

PT. Braja Mukti Cakra (BMC) is a manufacturing company specialising in engine components, clutches, brakes, axles, and undercarriages for cars and trucks. PT. BMC has 57 process lines, and three of these process lines do not meet the production target based on data from the Production Department for January to August 2022—namely, the Fly Wheel line process, Pressure Plate 2/1, and Pressure Plate 1/1. After calculating the effectiveness value using Overall Resource Effectiveness (ORE), there are still many ORE values below 85% or not optimal, and some are in the range of 40% to 60%, indicating the need for further improvement. After being explained using a fishbone diagram, there are four causal factors: humans, machines, materials, and method/tool designs. When the cause of the problem is known, a 5W + 1H analysis is conducted to identify and address the root causes of the issues that arise. So that the performance of the production process in the three is more effective

References

Aristriyana, E., & Fauzi, R. A. (2023). Analisis Penyebab Kecacatan Produk Dengan Metode Fishbone Diagram Dan Failure Mode Effect Analysis (FMEA) Pada Perusahaan Elang Mas Sindang Kasih Ciamis. Jurnal Industrial Galuh, 4(2), 75–85. https://doi.org/https://doi.org/10.25157/jig.v4i2.3021

Budianto, A. G. (2021). Analisis Penyebab Ketidaksesuaian Produksi Flute Pada Ruang Handatsuke Dengan Pendekatan Fishbone Diagram, Piramida Kualitas Dan FMEA. JIEOM: Journal of Industrial Engineering and Operation Management, 4(1), 17–23. https://doi.org/http://dx.doi.org/10.31602/jieom.v4i1.5368

Fauzi, H., Alhilman, J., Tatas, F., & Atmaji, D. (2021). Analisis Penerapan Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Dalam Mengevaluasi Efektivitas Mesin Cnc Millac Di Pt Dirgantara Indonesia Analysis Of Overall Equipment Effectiveness (OEE) And Overall Equipment Resource Effectiveness (ORE) In Evaluating The Effectiveness Of Cnc Millac Machines At Pt Dirgantara Indonesia. e- Proceeding of Engineering, 8(2), 2107–2114. https://openlibrarypublications.telkomuniversity.ac.id/index.php/engineering/article/view/14627

Febri Pratama, A., & Yuliawati, E. (2023). Penerapan Metode Overall Resource Effectiveness (ORE) Dan Root Cause Failure Analysis (RCFA) Untuk Meningkatkan Efektivitas Mesin. JISO: Journal of Industrial and Systems Optimization, 6(2), 102–109. https://doi.org/https://doi.org/10.51804/jiso.v6i2.102-109

Khikmawati, E., Anggraini, M., & Pratiwi, N. R. (2025). Analisis Penyebab Produk Rusak dengan Metode FMECA Dan Memberikan Usulan Perbaikan Dengan Konsep Kaizen 5W 1H Pada Produk Air Demineral Kemasan

200 ml. Jurnal Rekayasa, Teknologi, dan Sains, 9(1), 22–28. https://doi.org/https://doi.org/10.33024/jrets.v9i1.18991

Kurnia, Y., & Nasarudin, N. (2023). Perbaikan Kesehatan Dan Keselamatan Kerja Pada Proses Pembuatan Wajan Alumunium Dengan Metode Fishbone Diagram. JURNAL INDUSTRIAL GALUH, 5(2), 124–131. https://doi.org/https://doi.org/10.25157/jig.v5i2.3311

Lukita, S., Evania, E., Rosalia, Y., Layrensius, F., & Mariani, M. (2020). Pengukuran Kinerja Mesin Baking Cone

1 Dengan Metode Overall Equipment Effectiveness (OEE): Studi Kasus Pabrik Es Krim. JISI: Jurnal Integrasi Sistem Industri, 7(1), 65. https://doi.org/10.24853/jisi.7.1.65-71

Nursyahbani, Z., Sari, T. E., & Winarno, W. (2023). Usulan Penurunan Kecacatan Piston Cup Forging Menggunakan Fishbone Diagram, FMEA dan 5W+1H di Perusahaan Spare-part Kendaraan. Go-Integratif: Jurnal Teknik Sistem dan Industri, 4(01), 22–32. https://doi.org/10.35261/gijtsi.v4i01.8703

Pangestu, W. F., Suhendra, S., & Khofiyah, N. A. (2025). Analisis Penurunan Defect Pada Komponen Print Circuit Board (Pcb) Menggunakan Metode Pdca Dan Aplikasi Kaizen Di PT DEI. Journal Industrial Engineering and Management (JUST-ME), 6(01), 10–18. https://doi.org/https://doi.org/10.47398/justme.v6i01.96

Puspita, L. E., & Widjajati, P. (2021). Pengukuran Efektivitas Mesin Latexing Pada Produksi Karpet Permadani Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Di PT. XYZ. JUMINTEN : Jurnal Manajemen Industri dan Teknologi, 02(04), 1–12. https://doi.org/https://doi.org/10.33005/juminten.v2i4.295

Putu Widnyana, I., Ardiana, W., Wolok, E., & Lasalewo, T. (2022). Penerapan Diagram Fishbone dan Metode Kaizen untuk Menganalisa Gangguan pada Pelanggan PT. PLN (Persero) UP3 Gorontalo. Jambura Industrial Review, 2(1), 11–19. https://doi.org/10.37905/jirev.2.1.11-19

Sanjaya, W. E. P., Garside, A. K., & Wardana, R. W. (2024). Usulan Peningkatan Efektivitas Mesin Multi Bor dengan Menggunakan Metode Overall Resource Effectiveness dan Failure Mode Effect Analysis. Jurnal Rekayasa Sistem Industri, 13(1), 69–78. https://doi.org/10.26593/jrsi.v13i1.6520.69-78

Saputri, O. B., Nurul Huda, & Mulawarman Hannase. (2022). Analisis Rencana Elektronifikasi Keuangan Daerah dalam Memperluas Kontribusi Zakat dengan Pendekatan Fishbone Diagram Analysis. AL-MUZARA’AH, 10(1), 1–17. https://doi.org/10.29244/jam.10.1.1-17

Saroyo, G., Salmia A, S. L., Septiari, R., & Studi Teknik Industri S-, P. (2023). Peningkatan Efektivitas Mesin Bordir Sky Berbasis Overall Equipment Effectiveness (OEE) DAN Overall Resource Effectiveness (ORE) Pada Garmen Sun Embroidery. Jurnal Mahasiswa Teknik Industri), 6(2), 264–275. https://doi.org/https://doi.org/10.36040/valtech.v6i2.7430

Surya, N. L., & Ririh, K. R. (2021). Analisis Risiko Kecelakaan Kerja Menggunakan Metode HIRARC dan Diagram Fishbone pada Lantai Produksi PT DRA Component Persada. Go-Integratif : Jurnal Teknik Sistem dan Industri, 2(2), 135–152. https://doi.org/10.35261/gijtsi.v2i2.5658

Vitasari, P., Purnama, J. C., Harianto, S., & Achmada, F. (2022). Fishbone Diagram Untuk Menganalisis Penyebab Produktivitas Kerja Menurun pada Home Industri Pembuatan Roti. Prosiding SENIATI, 6(1), 182–

186. https://doi.org/https://doi.org/10.36040/seniati.v6i1.4938

Zulfatri, M. M., Alhilman, J., & Atmaji, F. T. D. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Pada Mesin Pl1250 Di PT XZY. JISI: Jurnal Integrasi Sistem Industri, 7(2), 123. https://doi.org/10.24853/jisi.7.2.123-131

Downloads

Published

2025-07-15

How to Cite

Madani, M. A., & Sudarwati, W. (2025). Analisis Efektivitas Line Proses Fly Wheel, Presure Plate 2/1 dan Presure Plate 1/1 dengan Metode Overall Resource Effectiveness (ORE) di PT. Braja Mukti Cakra. Jurnal Teknik Industri Terintegrasi (JUTIN), 8(3), 3290–3303. https://doi.org/10.31004/jutin.v8i3.47731