Perhitungan Nilai OEE Efektivitas Mesin Produksi Cup Menggunakan Metode Overall Equipment Effectiveness (OEE)
DOI:
https://doi.org/10.31004/jutin.v8i3.45772Keywords:
Machine, Six Big, Overall Equipment EffectivenessAbstract
This study aims to calculate the OEE (Overall Equipment Effectiveness) value as a measure of machine efficiency in the cup production process. OEE is an important parameter in evaluating machine performance, which includes three main factors, namely availability, performance, and quality. By using the OEE method, this study will analyze the effectiveness of cup production machines in a manufacturing industry. The data used include machine operating time, the number of products produced, and the number of defective products that occur during the production process. The results of the OEE calculation show the level of machine effectiveness that can be used to identify areas that require improvement. With optimal OEE results, companies can increase production efficiency, reduce downtime, and improve product quality. defects every production time.References
Mashabai, I., & Isti’aanah, A. (n.d.). JITSA Jurnal Industri&Teknologi Samawa Volume 4 (2) Agustus 2023 Analisis Defect Pada Beton U- Ditch Di Pt. Sinar Bali Binakarya Menggunakan Metode Fault Tree Analysis (FTA).
Prasetya, A., 11, A., & Setiafindari, W. (2023a). Analisis Produktivitas Mesin Filling cup Dengan Metode Overal Equipment Effectiveness dan Failure Mode And Effect Analysis. 2(1), 21–32. https://doi.org/10.20895/trinistik.v2i01.686
Prasetya, A., 11, A., & Setiafindari, W. (2023b). Analisis Produktivitas Mesin Filling cup Dengan Metode Overal Equipment Effectiveness dan Failure Mode And Effect Analysis. 2(1), 21–32. https://doi.org/10.20895/trinistik.v2i01.686
Sulaiman, F., Saefuddin, A., & Syarif, R. (2008). Strategi Pengelolaan Kawasan Industri Cilegon Menuju Eco Industrial
PARK. In Alinda FM Zain Strategi Pengelolaan Kawasan Industri Cilegon Menuju Eco-Industrial Park Jurnal Perencanaan Wilayah dan Kota (Vol. 19, Issue 2).
Zulfatri, M. M., Alhilman, J., & Atmaji, F. T. D. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) Dan Overall Resource Effectiveness (ORE) Pada Mesin Pl1250 Di PT XZY. JISI: Jurnal Integrasi Sistem Industri, 7(2), 123. https://doi.org/10.24853/jisi.7.2.123-131
Adesta, E.Y.T., Prabowo, A.H., & Agusman, D. 2018, Evaluating 8 Pillars Of Total Productive Maintenance (TPM) Implementation And Their Contribution To Manufacturing Performance. IOP, doi:10.1088/1757- 899X/290/1/012024.
Nakajima, S. 1988. Introduction to Total Productive Maintenance (TPM). Cambridge: Produktivity Press. Juran, J. M., & Gryna, F. M. (1993). Quality Planning and Analysis. McGraw-Hill.
Kumar, S., & Soni, G. (2015). "Impact of OEE on Manufacturing Performance." International Journal of Engineering Research & Technology (IJERT), 4(3).
Srinivasan, K., & Chinnaiyan, A. (2017). "Improving Equipment Efficiency Using OEE." International Journal of Mechanical and Production Engineering Research and Development (IJMPERD), 7(1).
Waluyo, B., Chriswahyudi, & Restianingsih. 2019. Analisa Perbaikan Produktivitas Menggunakan Metode Overall Equipment Effectiveness (OEE) Pada Mesin Filling Dengan Pendekatan Six Big Losses Untuk Mencari Penyebab Losses Tertinggi Pada Produksi Skincare Studi Kasus PT. XYZ. Jurnal Teknik: Universitas Muhammadiyah Tangerang, Vol. 8, No. 1: 90-99
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 M Amir Faisol, Nur Hamidah

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

