Analisis Persediaan Bahan Baku Penolong Menggunakan Metode ABC pada PGT Rejowinangun Trenggalek
DOI:
https://doi.org/10.31004/jutin.v6i4.21601Abstract
The research at PGT Rejowinangun Trenggalek aims to enhance efficiency and effectiveness using the ABC method formula. The research results reveal three categories of raw material components. Category A involves 2 items with a total cost of IDR 133,810,000, contributing approximately 79 percent of the total inventory funds. Category B includes 1 item, constituting around 7 percent of the total items, with an absorption cost of IDR 12,600,000. Category C comprises 3 items, accounting for about 13 percent of the total items. The ABC analysis provides an overview of cost distribution and raw material turnover, serving as a basis for efficient order planning.Downloads
Published
2023-10-30
How to Cite
Limbong, A. C., & Wulandari, L. M. C. . (2023). Analisis Persediaan Bahan Baku Penolong Menggunakan Metode ABC pada PGT Rejowinangun Trenggalek . Jurnal Teknik Industri Terintegrasi (JUTIN), 6(4), 1517–1522. https://doi.org/10.31004/jutin.v6i4.21601
Issue
Section
Articles of Research
License
Copyright (c) 2023 Albert Christian Limbong, Lusi Mei Cahya Wulandari
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.