[1]
Meganda, D.F. and Witjaksana, B. 2024. ANALISIS PERCEPATAN PROYEK PEMBANGUNAN MENGGUNAKAN METODE CRASHING DENGAN PENAMBAHAN TENAGA KERJA DAN SHIFT KERJA (STUDI KASUS : GEDUNG DESAIN KOMUNIKASI VISUAL ITS SURABAYA). Jurnal Review Pendidikan dan Pengajaran. 7, 4 (Dec. 2024), 17053–17059. DOI:https://doi.org/10.31004/jrpp.v7i4.38568.