[1]
Herliani, . E. and Paris , M.A. 2022. Analisis Kelayakan Ekonomi Proyek Infrastruktur Menggunakan Metode Net Present Value. Jurnal Pendidikan dan Konseling (JPDK). 4, 5 (Oct. 2022), 8605–8616. DOI:https://doi.org/10.31004/jpdk.v4i5.11522.