Evaluasi Jadwal Pelaksanaan Proyek Pembangunan Gedung Dengan Metode Program Evaluation And Review Technique (Pert)
Keywords:
Time, Evaluation, Method Program Evaluation and Review Technique (PERT)Abstract
Scheduling planning is very necessary in the implementation of a project, so that the possibility of a failure can be minimized. This study uses the Program Evaluation and Review Technique (PERT) method to evaluate the implementation schedule of the X building construction project in Kampar Regency. There are three times in the PERT method, namely optimistic time (a), normal time (m), and pessimistic time (b). Based on the calculations that have been carried out, scheduling using the PERT method in the construction of the X building in Kampar Regency resulted in 168 days with a 100% job probability, which means 18 days later than the existing schedule, which is 150 days. At the time of planning, it was known that the planners distributed the work weights not based on the actual results of the analysis, such as the number of workers and the level of productivity. The existing time for 150 days, based on the PERT method only has a probability of 0.0291% where the value is very low.References
Ahmad, D., Bambang, D. H., & Heni, D. (2018). Evaluasi Proyek Pembangunan Stone Crusher Machine Dengan Metode PERT/CPM Di Malimping, Lebak, Banten. In Lemlitbang. http://repository.uhamka.ac.id/1098/1/7. Heni Dati 2018 Evaluasi Proyek.pdf
Aulia, M. Z. (2020). Penerapan Metode CPM (Critical Path Method) Pada Proyek Konstruksi Pembangunan Bendungan Lau-Simeme Paket II Kab. Deli Serdang. 7, 6.
Lasari, O., & Sumarman. (2018). Analisis Manajemen Konstruksi Pada Proyek Pembangunan Rsud Brebes. Kontruksi, VII(2), 61–80.
Malifa, Y., Dundu, A. K. T., & Malingkas, G. Y. (2019). Analisis Percepatan Waktu dan Biaya Proyek Konstruksi Menggunakan Metode Crashing. Jurnal Sipil Statik, 7(6), 681–688.
Oetari, F. D. (2016). Evaluasi Waktu Pekerjaan Dengan Menggunakan Metode PERT Pada Proyek Pembangunan Asrama LPTQ.
Oka, J., & Kartikasari, D. (2019). Evaluasi Manajemen Waktu Proyek Menggunakan Metode PERT Dan CPM Pada Pengerjaan Proyek Reparasi Crane Lampson Di PT Mcdermott Indonesia. Journal of Applied Business Administration, 1(1), 28–36.
Rani, H. A. (2016). Manajemen Proyek Konstruksi. 99.
Setiawan, S., Syahrizal, & Dewi, R. A. (2017). Penerapan Metode CPM Dan PERT Pada Penjadwalan Proyek Konstruksi.
Syaiful, A. (2018). Analisis Penjadwalan Ulang Dengan Menggunakan Metode PERT (Program Evaluation And Review Technique) (Rescheduling Analysis With PERT Method). Universitas Islam Indonesia, 1–72.
Downloads
Published
Issue
Section
License
Penulis yang menerbitkan jurnal ini menyetujui ketentuan-ketenuan sebagai berikut:
- Penulis mempertahankan hak cipta dan memberikan hak jurnal atas publikasi pertama dengan karya yang secara serentak dilisensikan di bawah Lisensi Pengaitan Creative Commons yang memungkinkan orang lain untuk berbagi karya dengan pengakuan atas karya penulis dan publikasi awal dalam jurnal ini.