Putra, A. A. and Islah, M. (2018) “PERENCANAAN WAKTU DALAM PELAKSANAAN KONSTRUKSI DAPAT MENGURANGI TINGKAT KERUGIAN, KESALAHAN DI DALAM PENGERJAAN SUATU PROYEK”, Jurnal Teknik Industri Terintegrasi (JUTIN), 1(1), pp. 35–40. doi: 10.31004/jutin.v1i1.309.