Penerapan metode fuzzy analytical hierarchy process pada penentuan prioritas perawatan komponen jalan rel

Authors

  • Septiana Widi Astuti Politeknik Perkeretaapian Indonesia Madiun
  • Renaldy Yoga Septiyoko Politeknik Perkeretaapian Indonesia Madiun
  • Muhammad Adib Kurniawan Politeknik Perkeretaapian Indonesia Madiun
  • Puspita Dewi Politeknik Perkeretaapian Indonesia Madiun
  • Windi Nopryanto Politeknik Perkeretaapian Indonesia Madiun

DOI:

https://doi.org/10.31004/jutin.v7i4.35323

Keywords:

ballast, sleeper, rail, prioritization, fuzzy AHP

Abstract

This study uses the fuzzy analytical hierarchy process (FAHP) method to determine the maintenance priorities of railroad components on the section between Caruban Station - Babadan Station KM 155+000 to KM 157+200. FAHP was applied to evaluate and prioritize based on criteria including human resources, material, cost, risk, and level of damage, with participation from experts and academics. FAHP analysis showed that risk was the first-order criterion in priority assessment with a value of 0.31, followed by damage level with a value of 0.29, cost with a value of 0.17, material with a value of 0.14, and human resources with a value of 0.10. The resulting maintenance prioritization shows that ballast addition is the most urgent measure with the highest priority value of 0.54, followed by rail and sleeper maintenance with values of 0.27 and 0.18 respectively. The results of this analysis indicate a need for 1,456.60 m3 of additional ballast as a priority measure in the repair of railroad components in the studied segments.

References

Peraturan Menteri Perhubungan Nomor 60 Tahun 2012

Castelló-Sirvent, F., Meneses-Eraso, C., Alonso-Gómez, J., & Peris-Ortiz, M. (2022). Three Decades of Fuzzy AHP: A Bibliometric Analysis. Axioms, 11(10). https://doi.org/10.3390/axioms11100525

Image Enhancement Using Fuzzy Technique. (n.d.). www.ijert.org

Jannah, M. (2015). IDENTIFIKASI BAHAYA, PENILAIAN RESIKO, DAN PENGENDALIAN RESIKO PADA AKTIVITAS TAMBANG BATUBARA DI PT. KIM KABUPATEN MUARO BUNGO, PROVINSI JAMBI.

Lu, P., Tolliver, D., Zheng, Z., Consortium, M.-P., Institute, U. G. P. T., & Technology, O. of the A. S. for R. and. (2018). Highway-Rail Grade Crossing Traffic Hazard Forecasting Model. 37p.

Ouma, Y. O., Opudo, J., & Nyambenya, S. (2015). Comparison of Fuzzy AHP and Fuzzy TOPSIS for Road Pavement Maintenance Prioritization: Methodological Exposition and Case Study. Advances in Civil Engineering, 2015. https://doi.org/10.1155/2015/140189

Prosiding Seminar Nasional Teknologi dan Informatika, 2017?: Kudus, 25 Juli 2017. (2017). Badan Penerbit Universitas Muria Kudus.

Tang, D., & Solangi, Y. A. (2023). Fostering a Sustainable Energy Future to Combat Climate Change: EESG Impacts of Green Economy Transitions. Processes, 11(5). https://doi.org/10.3390/pr11051548

Downloads

Published

2024-10-15

How to Cite

Astuti, S. W. ., Septiyoko , R. Y. ., Kurniawan, M. A. ., Dewi , P. ., & Nopryanto, W. . (2024). Penerapan metode fuzzy analytical hierarchy process pada penentuan prioritas perawatan komponen jalan rel . Jurnal Teknik Industri Terintegrasi (JUTIN), 7(4), 2601–2608. https://doi.org/10.31004/jutin.v7i4.35323

Issue

Section

Articles of Research

Most read articles by the same author(s)