Analisa Beban Kerja Mental menggunakan Metode NASA TLX pada Departemen Logistik di PT XYZ

Authors

  • Nur Rochman Dwi Santoso Universitas Singaperbangsa Karawang
  • Kusnadi Kusnadi Program Studi Teknik Industri, Fakultas Teknik, Universitas Singaperbangsa Karawang

DOI:

https://doi.org/10.31004/jutin.v7i1.25024

Keywords:

Karyawan; Pengukuran Beban Kerja; Beban Kerja Mental; Metode NASA TLX;

Abstract

PT XYZ is a manufacturing company that has facilities to produce a variety of specialized chemicals that are used in various industries. Employees of the Logistics Department at PT. XYZ often have difficulties in completing their tasks according to the scheduled schedule. This situation often makes them work overtime to finish the work that's stacked. The requirement to ensure timely delivery and effective coordination with customers adds to their mental workload. In an attempt to determine the level of mental workload of the logistics department employees, a measurement of the mental labor load was carried out using the NASA TLX method. Based on the results of the measurements obtained, the result of the calculation of the average score of the total staff of the Logistics Department of 66.22 indicates that the classification of the overall mental work load of the employees included in the high level. The most influential indicators of mental workload in this study are mental demand, physical demand, and own performance.

References

Adikarana, N. A., Herwanto, D., & Rifa’i, M. R. (2022). Analisis beban kerja mental menggunakan NASA-TLX pada divisi produksi perusahaan metal stamping. Go-Integratif: Jurnal Teknik Sistem Dan Industri, 3(02), 98–109.

Dewi, D. C. (2020). Analisa Beban Kerja Mental Operator Mesin Menggunakan Metode Nasa Tlx Di Ptjl. Journal of Industrial View, 2(2), 20–28. https://doi.org/https://doi.org/10.26905/4881

Febiyani, A., Febriani, A., & Ma’Sum, J. (2021). Calculation of mental load from e-learning student with NASA TLX and SOFI method. Jurnal Sistem Dan Manajemen Industri, 5(1), 35–42. https://doi.org/https://doi.org/10.30656/jsmi.v5i1.2789

Fithri, P., & Anisa, W. F. (2017). Pengukuran beban kerja psikologis dan fisiologis pekerja di industri tekstil. Jurnal Optimasi Sistem Industri, 16(2), 120–130. https://doi.org/ttps://doi.org/10.25077/josi.v16.n2.p120-130.2017

Hart, S. G., & Staveland, L. E. (1988). Development of NASA-TLX (Task Load Index): Results of empirical and theoretical research. In Advances in psychology (Vol. 52, pp. 139–183). Elsevier. https://doi.org/https://doi.org/10.1016/S0166-4115(08)62386-9

Jeshika, J. (2019). Perkembangan Industri Nasional Menuju Industri Tangguh, 2035. CALYPTRA, 8(1), 1766–1775.

Johari, J., Tan, F. Y., & Zulkarnain, Z. I. T. (2018). Autonomy, workload, work-life balance and job performance among teachers. International Journal of Educational Management, 32(1), 107–120. https://doi.org/https://doi.org/10.1108/IJEM-10-2016-0226

Putri, U. L., & Handayani, N. U. (2017). Analisis beban kerja mental dengan metode NASA TLX pada departemen logistik PT ABC. Industrial Engineering Online Journal, 6(2).

Sari, M. R., & Suliantoro, H. (2021). Analisis Beban Kerja Mental Menggunakan Metode Nasa-Tlx Pada Divisi Lipat Pt Solo Murni. Industrial Engineering Online Journal, 10(3).

Sutrisno, E. (2009). Manajemen sumber daya manusia edisi pertama. Jakarta: Kencana Prenada Media Group, 41.

Downloads

Published

2024-01-27

How to Cite

Santoso, N. R. D. ., & Kusnadi, K. (2024). Analisa Beban Kerja Mental menggunakan Metode NASA TLX pada Departemen Logistik di PT XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 7(1), 404–411. https://doi.org/10.31004/jutin.v7i1.25024

Issue

Section

Articles of Research