Penerapan Lean Manufacturing Menggunakan Value Stream Mapping pada VCT Rotor di PT. XYZ

Authors

  • Amanda Nur Fathimah Universitas Singaperbangsa Karawang
  • Winarno Winarno Program Teknik Industri, Fakultas Teknik, Universitas Singaperbangsa Karawang

DOI:

https://doi.org/10.31004/jutin.v7i1.24788

Abstract

XYZ is an automotive component manufacturing company with two lines of production: the Shock Absorber Line and the VCT Line. One of the products on the VCT Line is the VCT rotor, with issues surrounding waste. Utilizing Lean Manufacturing approaches using the Waste Assessment Model and the Value Stream Analysis Tools is an effective way to solve issues and enhance efficiency in the VCT rotor system and production process at PT. XYZ. Total time savings as a result of the process change is 9,108.25 seconds, and the total lead time reduction in inventory is 34 days. The highest type of waste found in the VCT rotor is inventory, which accounts for 23,29% of the total waste. Overproduction contributes to 23,23% of the waste, while defect is responsible for 19,04%.

References

Chen, X., Sheng, J., Wang, X., & Deng, J. (2016). Exploring determinants of attraction and helpfulness of online product review: a consumer behavior perspective. Discrete in Nature and Society, 1–19.

Cox, J. F., & Blackstone, J. H. (2005). APICS Dictionary: The Industry Standard for More than 3,500 Terms and Definitions (11th ed.). Amer Production & Inventory.

Cresswell, J. W. (2009). Research Design Qualitative, Quantitative, and Mixed Methods Approaches 3rd edition (3rd ed.). SAGE Publications, Inc.

Creswell, J. W. (2008). Educational Research, Planning, Conducting, and Evaluating Quantitative and Qualitative Research (4th ed.). Pearson Education Inc.

Hines, P., & Taylor, D. (2000). Going Lean, Lean Enterprise Research Centre (1st ed.). Cardiff Business School.

Indriantoro, N., & Supomo, B. (2018). Metodologi Penelitian Bisnis untuk Akuntansi dan Manajemen. ANDI Yogyakarta.

Lucherini, F., & Rapaccini, M. (2017). Exploring the Impact of Lean Manufacturing on Flexibility in SMEs. Journal of Industrial Engineering and Management (JIEM), 10(5), 919–945.

Naibaho, H. H. (2014). Minimasi Waiting Time dengan Pendekatan Lean Manufacturing di Pabrik Kelapa Sawit (Studi Kasus: PKS Sei Pagar PTPN V). Universitas Islam Negeri Sultan Syarif Kasim Riau.

Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production (1st ed.). Productivity Press.

Rawabdeh, I. A. (2005). A Model for The Assessment of Waste in Job Shop Environments. International Journal of Operations & Production Management, 25(8), 800–822.

Waluyo, M. (2008). Produktivitas Untuk Teknik Industri (1st ed.). Dian Samudra.

Downloads

Published

2024-01-19

How to Cite

Fathimah, A. N., & Winarno, W. (2024). Penerapan Lean Manufacturing Menggunakan Value Stream Mapping pada VCT Rotor di PT. XYZ. Jurnal Teknik Industri Terintegrasi (JUTIN), 7(1), 590–598. https://doi.org/10.31004/jutin.v7i1.24788

Issue

Section

Articles of Research